翻訳と辞書
Words near each other
・ "O" Is for Outlaw
・ "O"-Jung.Ban.Hap.
・ "Ode-to-Napoleon" hexachord
・ "Oh Yeah!" Live
・ "Our Contemporary" regional art exhibition (Leningrad, 1975)
・ "P" Is for Peril
・ "Pimpernel" Smith
・ "Polish death camp" controversy
・ "Pro knigi" ("About books")
・ "Prosopa" Greek Television Awards
・ "Pussy Cats" Starring the Walkmen
・ "Q" Is for Quarry
・ "R" Is for Ricochet
・ "R" The King (2016 film)
・ "Rags" Ragland
・ ! (album)
・ ! (disambiguation)
・ !!
・ !!!
・ !!! (album)
・ !!Destroy-Oh-Boy!!
・ !Action Pact!
・ !Arriba! La Pachanga
・ !Hero
・ !Hero (album)
・ !Kung language
・ !Oka Tokat
・ !PAUS3
・ !T.O.O.H.!
・ !Women Art Revolution


Dictionary Lists
翻訳と辞書 辞書検索 [ 開発暫定版 ]
スポンサード リンク

California High Speed Rail Authority : ウィキペディア英語版
California High-Speed Rail

California High-Speed Rail is a high-speed rail system currently under construction in the state of California. By the end of Phase 1, the route will connect Los Angeles with San Francisco at speeds up to , providing a "one-seat ride" for the trip in 2 hours and 40 minutes. The system is required to operate without a subsidy, and to connect the state's major cities in the Bay Area, Central Valley, and Southern California.〔http://www.hsr.ca.gov/〕
Construction on the initial section from Merced to Bakersfield began in 2015 and is expected to end in 2019, after which it is planned that the Amtrak ''San Joaquin'' train will use the HSR tracks for faster conventional rail service. High-speed rail service is expected to begin in 2022 after the rails are extended south to Burbank. Phase 1 is planned to be completed in 2029. In Phase 2 (no timetable as yet), the system will be extended northerly (through the Central Valley to Sacramento) and southerly (through the Inland Empire to San Diego), reaching all the major population centers specified in Proposition 1A (2008).〔http://www.hsr.ca.gov/docs/about/legislative_affairs/SB1029_Project_Update_Report_030115.pdf〕 Construction is only fully funded through 2019, although the project is now automatically getting cap-and-trade funding amounting to hundreds of millions of dollars annually.
With an anticipated construction and planning cost of $68.4 billion (in year-of-expenditure dollars) for Phase 1, the project is the most expensive public works project in United States history.
The project is managed by CHSRA (the California High-Speed Rail Authority), a state agency run by a board of governors.
==System route and speed requirements==

AB 3034, the authorizing legislation for Proposition 1A (which was submitted to the voters and approved), specified certain route and travel time requirements. Among these were that the route must (1) link downtown San Francisco with Los Angeles and Anaheim, and (2) link the state's major population centers together "including Sacramento, the San Francisco Bay Area, the Central Valley, Los Angeles, the Inland Empire, Orange County, and San Diego." The first phase of the project must link San Francisco with Los Angeles and Anaheim. Up to 24 stations were authorized for the completed system.
This system will be built in two phases. Phase 1 will be about long, and is planned to be completed in 2029, connecting the downtowns of San Francisco, Los Angeles, and Anaheim using high-speed rail through the Central Valley.〔http://www.hsr.ca.gov/About/Business_Plans/2012_Business_Plan.html〕 In Phase 2, the route will be extended in the Central Valley north to Sacramento, and from Los Angeles east through the Inland Empire and then south to San Diego. The total system length will be about long. Phase 2 has no dates as yet.
The Initial Construction Segment (ICS) of high-speed tracks runs from Merced to Bakersfield in the Central Valley. Simultaneously with the ICS construction, there are "bookend" and connectivity investments〔http://www.hsr.ca.gov/Programs/Statewide_Rail_Modernization/index.html〕 including electrification of the San Francisco Peninsula Corridor used by ''Caltrain'', improvements to tracks and signaling for ''Metrolink'' in the LA area and Caltrain, and better passenger interconnections for Caltrain, Amtrak, and other Northern California rail lines.
As regards train speed and travel times, the train must also be electric and capable of a sustained operating speed of no less than . There are also a number of travel time benchmarks. The ones applicable to Phase 1 of the project are: (1) a maximum nonstop travel time between San Francisco and San Jose of 30 minutes, and (2) a maximum nonstop travel time between San Jose and Los Angeles of 2 hours and 10 minutes. (Thus, a nonstop time from San Francisco to Los Angeles in 2 hours and 40 minutes.)

抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)
ウィキペディアで「California High-Speed Rail」の詳細全文を読む



スポンサード リンク
翻訳と辞書 : 翻訳のためのインターネットリソース

Copyright(C) kotoba.ne.jp 1997-2016. All Rights Reserved.